Binghamton University Replace Storefront And Exterior Doors – Bartle Library, University Union, And Couper Administration Building
Locations
4400 Vestal Parkway East, Binghamton , NY 13903
Description
Description: Asbestos abate all materials as indicated, provide temporary partitions and egress signage around each work area as project progresses, remove existing materials as noted in contract documents, prepare existing openings to receive new materials
Key Trades:
Asbestos Abatement
Masonry Restoration
Structural Steel
Exterior Wall Panels
Vegetated Roofing
Aluminum Framed Entrances, Storefronts & Curtain Walls
Painting
Roller Window Shades
Fire Suppression
Plumbing
Mechanical
Electrical
Subcontractors/Suppliers
Fahs Construction Group, Inc. invites all companies to submit their pricing in a timely fashion to: fahsgcestimating@fahsconstruction.com
Fahs Construction Group encourages any and all applicable MBE, WBE, and SDVOB companies to bid on the project. The goals for this project are 10% MBE, 10% WBE, and 3% SDVOB.
For access to bidding documents please send a request to the email listed above.
Please provide your bid at least one hour before the bid time listed.
SUNY Oneonta Grant Hall Minor Rehabilitation
Locations
108 Ravine Parkway, Oneonta, NY 13820
Description
This project consists of a Level 2 Alteration renovation and modernization of select common areas within Grant Hall, a student residence hall on the SUNY Oneonta campus. The scope is limited to existingcorridors, student hub and lounge spaces, study areas, kitchenettes, and two student bedrooms located on the second and third floors. Improvements include replacement of interior finishes throughout corridor and amenity spaces, renovation of existing student gathering areas, creation of new and expanded study spaces on all residential floors, and construction of a new student kitchen on the second floor. The work is intended to enhance the functionality, appearance, and overall student experience within the residence hall while maintaining the existing building use and program. The project also includes associated architectural, mechanical, and electrical upgrades, including lighting replacement throughout corridors and renovated spaces, minor HVAC modifications, and hazardous material abatement within the areas of renovation. All work will occur within the existing building envelope. No additions, increases in building height or area, changes to occupancy classification, occupant load, means of egress, or building use are proposed. The existing building will remain un-sprinklered, and the renovation is intended to revitalize common residential spaces while preserving the facility's existing function as student housing.
Key Trades:
• Asbestos Abatement
• Finish Carpentry
• Doors, Frames & Hardware
• Aluminum Windows
• Drywall
• Flooring
• Painting
• Plumbing
• Mechanical
• Electrical
Subcontractors/Suppliers
Fahs Construction Group, Inc. invites all companies to submit their pricing in a timely fashion to: fahsgcestimating@fahsconstruction.com
Fahs Construction Group encourages any and all applicable MBE, WBE, and SDVOB companies to bid on the project. The goals for this project are 11% MBE, 19% WBE, and 6% SDVOB.
For access to bidding documents please send a request to the email listed above.
Please provide your bid at least one hour before the bid time listed.
SUNY Broome Community College – Decker Hall – Dental Hygiene Renovation
Locations
907 Front Street, Binghamton, NY 13905
Description
This project consists of renovation work to Decker Hall’s Dental Hygiene suite located on the SUNY Broome campus.
Key Trades:
• Interior Architectural Woodwork
• Hollow Metal Doors And Frames
• Aluminum Framed Storefronts
• Drywall
• Tiling
• Resilient Flooring
• Painting
• Signage
• Metal Lockers
Subcontractors/Suppliers
Fahs Construction Group, Inc. invites all companies to submit their pricing in a timely fashion to: fahsgcestimating@fahsconstruction.com
Fahs Construction Group encourages any and all applicable MBE, WBE, and SDVOB companies to bid on the project. The goals for this project are 3.5% MBE.
For access to bidding documents please send a request to the email listed above.
Please provide your bid at least one hour before the bid time listed.
Broome Developmental Center Building 1/1G Interior Renovations, Abatement & Related Site Work
Locations
249 Glenwood Road, Binghamton, NY 13905
Description
This project consists of interior renovation work and associated site work to Building 1/1G of the Broom Developmental Center campus.
Key Trades:
Asbestos Abatement
Masonry
Structural Steel
Architectural Wood Casework
Foamed In Place Insulation
Roofing
Hollow Metal Doors, Frames & Hardware
Aluminum Framed Entrances
Drywall
Flooring
Painting
Food Service Equipment
Fire Suppression
Plumbing
Mechanical
Electrical
Landscaping
Subcontractors/Suppliers
Fahs Construction Group, Inc. invites all companies to submit their pricing in a timely fashion to: fahsgcestimating@fahsconstruction.com
Fahs Construction Group encourages any and all applicable MBE, WBE, and SDVOB companies to bid on the project. The goals for this project are 10% MBE, 20% WBE, and 6% SDVOB.
For access to bidding documents please send a request to the email listed above.
Please provide your bid at least one hour before the bid time listed.
