| |
Projects by Division:
General Construction:
Upstate Medical University
Vertical Expansion Hampton Inn and Suites C.S. Driver Middle School The Hearth at Stones Crossing Sycamore Village SUNY Cortland
Integrated Child Care Center YWCA of Binghamton Heavy Highway:
SR 434 Shahola Bridge Replacement Route 96, Owego Bridge Replacement Memorial Street Bridge Rosendale Bridge Rehabilitation Trout Creek Bridge SR 0081 Section FY7 Asphalt Paving:
Borg Warner Morse TEC A.O. Fox Memorial Hospital
George Jessup Road Putnam Group Parking Lot Reconstruction Upstate Shredding, Inc.
Millenium Pipeline, Inc. |
Heavy Highway Project:
|

|

|
| Project Name: |
SR 0081 Section FY7 |
| Location: |
Lackawanna & Luzerne Counties, PA |
| Owner: |
Penn DOT District 4 |
| |
| Description: | Rehabilitate three (3) bridges on I-81 in the Boroughs of Moosic and Pittston. The reinforced concrete bridge deck, ½ section concrete barriers and reinforced concrete approach slabs were removed and replaced on each of the structures. The existing steel beams were retrofitted with steel plates to extend the tension areas, and intermediate and end diaphragms were selectively replaced. The beam seats, bearings and backwalls were also removed and replaced. Two (2) temporary bridges carrying two travel lanes in one direction served to minimize disruptions to those using this heavily traveled corridor between the Scranton and Wilkes-Barre areas of Pennsylvania.
|
|
|